I was not happy and was not even considering
settling down. Beba was content to just be there for me whenever
I happened back her way and I was happy travelling the world. When
we were together she would push me to pray to the Virgin Mary to
help me and watch over me. I tried to explain that the virgin was
dead and hopefully living somewhere special with God. I tried to
explain that only God could help us as he helped her. But she was
religiously faithful to praying to the virgin. She would not leave
the house without standing in front of the Virgin Mary's picture
and saying a prayer. I do not ever remember her praying to God to
help with anything. Whenever I saw her doing this it made my stomach
do flips almost to the point of nausea.
The project in Mexico lasted until the beginning of 1995. I was
able to negotiate a contract with one supplier to put together individual
kits that included all of the components we needed for this project.
I made upgrades to the way the controls were to be laid out. These
upgrades were later recognized by management and implemented in
our state side production facility. Throughout the installation
of the project I learned to speak Spanish, which made my job much
easier.
In May 1995 I was asked to go to Belgium for planning an additional
installation of four capsule production machines in China. In the
past the controls in China had been using designs from the plants
in Europe. I planned ahead and got quotes, drawings and copies of
the latest version of the control system we were using in Greenwood.
At the meeting I proposed that we utilize the Greenwood version
for the controls. The Belgium project manger had already arranged
a presentation from their engineers. It was decided due to costs
being equal and that the Greenwood personnel would be building the
machines to follow my plan.
In November 1995 I was asked to go to Belgium for training on a
system designed and used at our affiliate there for preparing the
gelatin viscosity. I learned the system well enough that I was asked
to install two of them in our facility in Mexico. I supervised the
installation of the mechanical and control systems. It utilized
Siemens PLC and Fix based PC control. I converted the operator alarms
on the operator interface to Spanish. I trained the technicians,
operators, and process engineers on the operation
|